Building and construction industries come with a huge number of challenges and one among them is builder’s waste removal. Finding the most efficient and cost-effective construction rubbish removals is difficult most of the times. Building waste removal is a never-ending job for any contractor and always accompanies the following issues.

  • Safety
  • Budget
  • Timeframe
  • State regulations
  • Labour union rules
  • Weather conditions
  • Sub-contractor relations and more.

Construction Waste Removal – The Current Challenges

Dealing with the builders rubbish removal in Eastern Suburbs Sydney is one of the most challenging tasks for contractors, and they should seek for alternative disposal methods to clean up the never-ending accumulation of this junk. Framing a solid construction waste management is necessary as disposal costs are on a high these days.

The need for reuse and recycling of builders waste materials has become a pressing concern because the landfill space is diminishing rapidly.

Best Practices for Handling Construction Waste

Construction waste is segregated into following three categories.

  • Waste from new construction sites. (This includes new material scrap, packaging wastes and more)
  • Demolition debris from old building (It includes remodelling wastes such as old wood, insulation, plaster, brick, fixtures, appliances, etc.)
  • Wastes from large civil work projects such as concrete, asphalt, rubble from highways and bridges.

One thing to note here is that most of these waste materials are reusable or recyclable in one form or another.

Recycling Construction Waste Materials

When it comes to recycling builder’s waste debris, you can recycle most common wastes such as concrete porcelain, rigid plastics, tile, lumber, metals, masonry, plastic, rock, carpet, insulation and more.

Here we have provided a few suggestions on how you can reuse your construction waste materials.

  • Inert materials can be used for road base
  • Cardboard and paper can be reused for packaging
  • Clean woods can be used for mulch and biomass
  • Dirt, rock, and sand can be used as landfill cover
  • You can covert crushed concrete into gravel
  • Drywall and Gypsum wall reused

Hazardous Materials from Construction and Demolition Waste

The following list shows various hazardous materials that show up in different construction sites.

  • Aerosal cans and empty containers
  • PCB containing light ballasts
  • Oil-based paint, paint thinner
  • Lead containing elements
  • Asbestos-containing materials
  • Mercury-containing lighting bulbs and lamps
  • Sanding dust
  • Treated woods

Tips for Salvaging Useful Waste Materials

When renovating or building a structure, consider separating and salvaging useful materials, including lumber, fixtures, hardware, and appliances instead of creating a pile of mixed materials. Create a systematic approach to remove materials from structures for reuse and recycling carefully. Send building waste materials to several outlets that accept used building materials.

According to the recent research reports, “recycling construction waste is equivalent to over 4, 300 acres at a depth of 50 feet landfill area.” That’s over 3 billion square yards of landfill each year. From the above report, it is evident that recycling and re-purposing construction waste really makes a difference.